Skip to main content

Our Design + Build method

From idea to keys. One contract, one point of contact.

Five steps, from feasibility to commissioning. We hold the price and deadline commitment for the entire project: design, execution, handover, warranties. The feasibility visit is paid, deducted from the preliminary-studies contract; its amount is given to you by phone or in a quote.

Internal ISO 19650 tools (BIM, shared CDE). In public procurement, the mission stages (esquisse / APS / APD / PRO-DCE / ACT / DET / AOR — still called “loi MOP” phases in the trade) are governed by the French Public Procurement Code, art. L. 2410-1 to L. 2432-2; for private projects we operate under Architecteurs contracts adapted for Design + Build.

Five stages, written for you (not for us)

How a Xiléades project unfolds, from your side of the desk. These are not the technical phases (sketch, design development, permit...) — these are what you live through, week by week. The technical details are below, for those who want to dig.

01 · Pre-show · Depending on the project

We understand, you understand

The decoder, Hélène or Alexis replying in person (phone, short video call, or voice note — your choice), the first meeting. You present your project; we share our reading. By the end, you know whether we're going forward together — or not.

Vous recevez :Project synthesis, personal reply from the architect, indicative range.

02 · Signing · One day

A printed log, not an email

When you sign, you receive a printed booklet in person (or by courier): team, milestones, contacts, glossary, contract inside. It's the first physical object of the project — so it starts in your mind, not in your inbox.

Vous recevez :A6 project log, personalised wood object, signed contract.

03 · Build · Delivery date set in the contract

A 90-second video, every Friday

You can't be on site, and that's normal. Every Friday, Alexis films and sends a vertical video: where we are, what we did this week, the thing that deserves your attention, what's next, honest status. No music. No filter. No app.

Vous recevez :Private weekly video, SMS reminder Friday 6pm, scripted mid-build visit.

04 · Handover · One day

We hand over the keys — properly

Not an email with the technical file. A ceremony: photographer, USB with the full video archive, space staged, plants, fresh bread. You walk into your home for the first time — we want that to be the closing photo you keep.

Vous recevez :In-person handover, full video archive, photographer.

05 · Afterlife · Over 3 years

We come back

Visit at 1 year, visit at 3 years. We look at how the place aged, what works, what we'd do differently. Small gift. No commitment expected from you — it's our standard.

Vous recevez :Two scheduled courtesy visits, direct contact preserved.

Step 01 · Feasibility

Site visit, feasibility study, binding pre-budget.

Timeline: Depending on the project

What we deliver

  • · Dedicated site visit (terms specified during the first call)
  • · Feasibility note: program, administrative constraints, timelines
  • · Realistic pre-budget, consistent with your envelope
  • · Contract proposal (preliminary study or direct Design + Build)

What we expect from you

A written brief, your budget envelope, and the building's history.

Step 02 · Design

Schematic then detailed design, up to the price commitment.

Timeline: Duration set in the study contract

What we deliver

  • · Volumes, plans, facades, structural principles
  • · Shared BIM model (LOD 300, ISO 19650)
  • · Finalized PRO-level plans + descriptive notice (client deliverables at end of design phase)
  • · Estimate by trade and Design + Build price commitment

What we expect from you

Validation at each milestone and arbitration on proposed options.

Step 03 · Permits & Tendering

DP, PC, DAAERP: we file, we consult contractors, we contract.

Timeline: Depending on processing

What we deliver

  • · Permit application file (PC, DP, DAAERP / AT-ERP) — filed after signing the construction contract
  • · Contractor consultation: internal DCE (CCTP + execution plans + schedule) sent only to consulted firms
  • · Contracts signed with selected companies
  • · Contractors' all-risks insurance activated

What we expect from you

Availability for potential discussions with the instructor or ABF.

Step 04 · Build / Construction

A single point of contact, price and deadline contractually committed.

Timeline: Delivery date set in the contract

What we deliver

  • · Weekly site meetings, minutes after each meeting
  • · Consolidated monthly price / schedule tracking
  • · Integrated multi-trade coordination
  • · Client site visits at each draw request

What we expect from you

Occasional presence at key milestones and validation of any amendments.

Step 05 · Delivery & Commissioning

OPR, utility connections, commissioning, snag list resolution, GPA.

Timeline: Handover + 1-year GPA

What we deliver

  • · OPR followed by signed handover certificate
  • · Fluids commissioning, equipment, regulatory checks
  • · Dossier des Ouvrages Exécutés (DOE) delivered
  • · 1-year GPA tracking + decennial / biennial warranty activation

What we expect from you

User feedback to calibrate snag list resolution.

Framework & guarantees

Six concrete commitments.

RC pro, décennale, all-risks

Insurance taken out: professional liability, ten-year liability (décennale), contractors' all-risks (TRC)

Design signed by an architect from the team

Members of the Les Architecteurs® network

ISO 19650 method

ISO 19650-1 and -2:2018: BIM, shared CDE, clear information levels

Final completion warranty

Defects cleared within 1 year, formalised follow-up

Delivery date in the contract

Written into the construction contract, with the late penalties it provides for

Milestone payments

Calls for funds follow the schedule written into the construction contract

Tools

One project, one shared truth.

BIM level LOD 300+

Shared digital model, conflict detection before construction, reliable surveys.

ISO 19650 compliant CDE

Common Data Environment: a single space for all documents, tracked versions.

Weekly reporting

Structured minutes after each meeting, quantified progress indicators, no guesswork.

Single contractual commitment

One price, one deadline, one site insurance policy, one decennial warranty. Aligned with Architecteurs cooperative contracts.

Your project portal, online

Schedule, site journal, materials, contracts: your entire project in a secure space, accessible 24/7.

Discover the client portal

Project decoder

Start my project

4 minutes. 6 questions. A personal reply from Hélène or Alexis by Monday 23 November at the latest.

Why 4 minutes instead of a contact form?

Because the person who calls you back is not a salesperson — it is the architect who will draw your project. We want to understand before we propose a meeting, not the reverse.

We answer personally by Monday 23 November at the latest. Phone, short video call, or voice note — your choice.