Who designs
- Classic architect-led procurement
- The architect, under contract with you.
- General builder alone
- The builder's design office, or nobody.
- Design + Build
- An architect, in the design team assembled by the general contractor.
Reference page
Design + Build, also called design-and-build, entrusts the design of your project and its construction to the same partner. At Xiléades Architecteurs, a general contractor and member of the Les Architecteurs network, that partner commits by contract to a firm global price and to a delivery date. This page explains what that changes, who it is for, and when it is not the right choice.
Definition
In a building or fit-out project, two trades usually follow one another: the one that designs, the architect and the engineering consultants, and those that build, the contractors of each trade. The client signs a contract with each of them and carries the coordination between them.
Design + Build brings these two trades under a single contractual responsibility. The client has one contact, one price, one deadline. The design is still signed by an architect, because the law requires it for most planning permits and because that is what makes the quality of the project; the construction is carried by the general contractor, who selects, contracts and coordinates the trades.
Three expressions describe this arrangement depending on the context. They are not quite synonyms.
Comparison
Three ways to contract for the same building. None is bad in itself: each distributes work, risk and responsibility differently.
| Criterion | Classic architect-led procurementArchitect on one side, contractors on the other | General builder aloneWorks without a dedicated architect | Design + BuildXiléades, general contractor |
|---|---|---|---|
| Who designs | The architect, under contract with you. | The builder's design office, or nobody. | An architect, in the design team assembled by the general contractor. |
| Who builds | Trade contractors, each under contract with you. | The general builder and its subcontractors. | The general contractor and the companies it contracts. |
| Number of contracts you sign | One per party: often five to fifteen. | One, sometimes preceded by a separate design contract. | A study contract, then a construction contract. |
| Who carries the price | You: the architect's estimate does not bind the contractors. | The builder, on a specification it has often written itself. | The general contractor: firm global price when the construction contract is signed. |
| Who carries the deadline | Each contractor for its trade; one delay shifts the others. | The builder, for the works part. | The general contractor, from the end of studies to handover. |
| Coordination of trades | The architect's task, by delegation; the contractors remain your counterparties. | Internal to the builder. | Internal to the general contractor, which answers for it to you. |
| When something goes wrong | It has to be established whether the designer or the builder answers for it. | The builder, within the limits of what it designed. | A single responsible party: the general contractor, design and execution included. |
| When it is the right choice | You want to tender the contractors yourself and keep control of each contract. | Simple works, with no design or permit at stake. | You want an opening date that holds, a budget known before you start, and a single contact. |
Classic architect-led procurement remains the market reference, and it is the one we show for comparison on our Pricing page. Xiléades does not sell it: we work in Design + Build. Our ranges by building type
At Xiléades
We do not commit to a price on an idea. The firm global price is signed once the project is drawn, priced by trade and authorised. Before that, each stage has its own contract, and you can stop at any of them.
01
A first on-site meeting, paid for, which funds real analysis work: programme, constraints of the building and of planning rules, a first order of magnitude for the budget. Its amount is given to you by quotation and is deducted from the study contract if you go further.
02
Detailed feasibility, outline then detailed design, shared BIM model, permit application. At the end of these studies we know the project precisely enough to commit to its price.
03
The contract that commits the firm global price and the delivery date. It relies on the standard contracts that the Les Architecteurs cooperative provides to its members. The price then changes only by an amendment signed by you, or through the indexation mechanisms written in the contract.
Who it is for
The arrangement makes most sense when the opening date, business continuity or budget control weigh as much as the architecture. That is the case for most professional projects, and for some private ones.
Xiléades Architecteurs works in Paris and the Île-de-France region. Beyond, we design the project and site supervision goes to a member of the Les Architecteurs network based near you.
Design + Build is not our only trade: we also carry out technical studies and preliminary studies as a service, site supervision, and the BIM structuring of a building portfolio's data.
The limits
An arrangement that promises everything to everyone is not serious. Here are the cases where we advise something else, or where we set conditions.
That is legitimate, and it is the essence of classic architect-led procurement. In Design + Build, the general contractor consults and selects the contractors, because it answers for their work. You may ask to know which companies were selected; you do not choose them in our place.
A firm price is signed on a defined project. As long as surfaces, uses or the level of finish are moving, we stay under a study contract. Signing a global price on a vague programme protects nobody well.
In public procurement, design-and-build is a separate type of contract, reserved for cases defined by the Public Procurement Code. Outside those cases, design and works must be separated, and we then respond in that framework, in a consortium with a co-contracting architect.
For work with no design and no permit, a single builder does the job and costs less. Design + Build is justified when there is something to design, to authorise and to coordinate.
The committed price covers what the studies made visible. A change you request, or a genuinely unforeseeable condition discovered during demolition, gives rise to a priced amendment accepted before execution. The difference from other arrangements is that these cases are written into the contract in advance, with their mechanism.
Project decoder
4 minutes. 6 questions. A personal reply from Hélène or Alexis by Friday 6 November at the latest.
Why 4 minutes instead of a contact form?
Because the person who calls you back is not a salesperson — it is the architect who will draw your project. We want to understand before we propose a meeting, not the reverse.
We answer personally by Friday 6 November at the latest. Phone, short video call, or voice note — your choice.